Wash n' Fold Map Summary Sheet

Page 1 of 4
Process observedWash n' Fold fulfillment
DateRepresentative Friday
Event log referenceRepresentative current-batch run
Time unitMinutes
Time zoneNot applicable
Clock originFriday, 7:00 a.m.

Keep the observation unit and cohort visible. Evidence and map instructions belong with each summary. Use the separate order projection for Batch Release; do not add its wait to the load-level wait.

Drop-off and ticket

Unit: Order   n: 39   Role: Customer, staff   Value: RNVA   Type: Step

QuantitySum (min)Average (min)
P/T115.23.0
S/T0.00.0
W/T197.85.1

Variation / evidence: W/T range 0.0-32.1 min; Friday 91

Map instruction: Keep as process step

Sort and tag

Unit: Order   n: 39   Role: Staff   Value: RNVA   Type: Step

QuantitySum (min)Average (min)
P/T187.64.8
S/T0.00.0
W/T174.14.5

Variation / evidence: W/T range 0.0-21.4 min; Friday 91

Map instruction: Keep as process step

Wash n' Fold Map Summary Sheet

Page 2 of 4

Wash

Unit: Load   n: 65   Role: Staff / washer   Value: VA   Type: Step

QuantitySum (min)Average (min)
P/T1977.230.4
S/T96.91.5
W/T32560.1500.9

Variation / evidence: W/T range 0.8-972.8 min; Friday 91

Map instruction: Show Batch Release from the separate order projection; do not add this load wait again

Dry

Unit: Load   n: 65   Role: Staff / dryer   Value: VA   Type: Step

QuantitySum (min)Average (min)
P/T2944.945.3
S/T42.50.7
W/T51.80.8

Variation / evidence: W/T range 0.0-6.8 min; Friday 91

Map instruction: Keep as process step

Wash n' Fold Map Summary Sheet

Page 3 of 4

Fold and package

Unit: Order   n: 39   Role: Staff   Value: VA   Type: Step

QuantitySum (min)Average (min)
P/T630.816.2
S/T19.50.5
W/T139.43.6

Variation / evidence: W/T range 0.0-20.5 min; Friday 91

Map instruction: Reunite compatible loads before folding; show correction branch

Stage and notify

Unit: Order   n: 39   Role: Staff   Value: RNVA   Type: Step

QuantitySum (min)Average (min)
P/T155.04.0
S/T0.00.0
W/T1479.137.9

Variation / evidence: W/T range 8.6-45.0 min; Friday 91

Map instruction: Show Notification Batch queue; do not duplicate this wait

Wash n' Fold Map Summary Sheet

Page 4 of 4

Fold correction

Unit: Order   n: 5   Role: Staff   Value: NVA   Type: Step

QuantitySum (min)Average (min)
P/T33.86.8
S/T0.00.0
W/T28.05.6

Variation / evidence: W/T range 0.0-18.0 min; Friday 91

Map instruction: Show correction branch separately from normal folding

Batch Release

Unit: Order   n: 39   Role: Release rule   Value: NVA   Type: Queue

QuantitySum (min)Average (min)
P/T0.00.0
S/T0.00.0
W/T19566.3501.7

Variation / evidence: First Wash setup start minus first Wash queue entry, once per order

Map instruction: Use this queue label instead of the 65-load mean; never add both waits